In March 2021 Port Stephens Council had a roadway wash away from a large storm event. The pressure was on to reinstate the road as quickly as possible with the construction of an InQuik integral bridging system. Port Stephens Council engaged Bridge Knowledge to undertake the detail structural design with their team presenting some strong and sound recommendations for a suitable and cost-effective substructure. Bridge Knowledge and their team showed care and due diligence with the bridge structure detail design and they went to a high level of detail to ensure that the project during construction went smoothly. Bridge Knowledge responded to RFIs and post IFC design clarifications on time to ensure the construction program was expedited. Port Stephens Council would re-engaged and recommend for future works.
Michael Coyte
Port Stephens Council